 Gas Gathering System and Plant Inlet Separation Design
Event Date :    11/3/2006  3:30 PM - 11:30 PM (GMT 0)
Posted By :    Forum Administrator
Event Details :    

November 3 to November 3, 2006
Gas Gathering System and Plant Inlet Separation Design
Calgary, Alberta, Canada

This one-day course is designed to familiarize technical professionals with the design of gas gathering lines and plant inlet separation. The equations that have been developed for pressure drop estimation are reviewed, with emphasis on understanding the assumptions involved in some of the simplifications in the equations. Methods for preventing the formation of hydrates and the control of internal pipe corrosion are covered in detail, with emphasis on the effects of sour gas in this regard. Pipe design parameters, such as grade, required wall thickness and optimum diameter are explained. The design of line looping for increasing throughput is covered. An Excel spreadsheet program for calculating pressure drop in horizontal gas flow and temperature drop in gas lines is included, along with design calculations for line-looping and Flanigan’s method of two-phase flow calculations, and plant inlet separator sizing. A complete set of course materials and lunch are included.

Outline
Introduction
Equations for Gas Flow in Pipelines
Friction Factor
Temperature Drop Estimation
Sour Gas Considerations
Pipe Materials, Grade, Category
Optimum Design Pressure, Pressure Drop, and Diameter
Hydrate Prevention and Corrosion Control
Two-Phase Flow in Pipes
Line Looping
Plant Inlet Separator Design and Liquid Slug Size Estimation


http://www.peice.com/eventdetails.aspx?event=102751&frfi=84627
 
Contact:  Skip Hiebert, 1-403-923-3748

Edited by Forum Administrator - 10/13/2006 9:24 PM GMT

 
     